Question 89 · LDEK · Dental laboratory technology

Indicate the proper sequence of metal casting fabrication:

1) investment of the wax model;
2) mounting the sprue;
3) fabrication of the mould;
4) cooling the flask;
5) removal of the wax model from the cast;
6) metal casting.
The correct answer is:
  1. A. 5,2,1,3,4,6.
  2. B. 5,2,1,3,6,4.
  3. C. 5,1,2,3,6,4.
  4. D. 2,5,1,3,4,6.
  5. E. 2,5,1,3,6,4.
Hint

The sprue is attached while the pattern is still on the die, and the ring is cooled only after the metal has been cast.

The answer, the explanation and a note on every option are available once you log in. The account is free: topic tests, a mock exam, mistake review and statistics.

Create a free account Log in

More questions on Prosthodontics